5 ways automation can streamline assembly operations

Bosch Rexroth offers 5 key ways to incorporate lean manufacturing principles into assembly operations – even for automated processes. Here's advice on how automation can help implement lean concepts.

SOURCE: Bosch Rexroth

05/23/2011


Bosch Rexroth Podcast Discusses “Lean in Assembly Operations”Lean manufacturing expert, Dan Fleming, worked with Bosch Rexroth to outline how automation can work with lean concepts to make assembly operations more efficient. Fleming, who is Continuous Improvement Manager of the Greater Boston Manufacturing Partnership (GBMP), stresses that although a common perception is that automation builds in waste and excess production, automation can actually streamline processes that are typical of a wasteful manual assembly line. Five key points of advice follow from Fleming.

1. Mistake-proofing, standardization and consistency, considered hallmarks of automation, also are important concepts of lean manufacturing.

2. Design engineers should consider lean principles when designing automated processes. For example, robots on an assembly line should exclude additional movements that are not an integral part of the actual task. By limiting wasteful movement, the robot could complete the task faster and the item would be assembled quicker, and the process becomes even leaner.

3. Countering the common assumption that automation is expensive, Fleming explains that simply improving or modifying processes on a large machine could achieve a significant reduction in changeover time. If changing tools is necessary, for example, by removing and then replacing four bolts, operators should question if the same task can be completed safely with two bolts. This cuts the time needed to attach the tool by 50 percent, and that savings may be amplified across multiple tools to save additional time.

4. According to Fleming, overproduction is the worst waste because it perpetuates even more waste: moving the extra product, storing it, counting it and paying tax on it. It’s more efficient to keep a big machine idle than produce things that are not needed. A lean alternative, says Fleming, would be to add multiple smaller machines so the assembly line is more flexible.

5. Fleming also recommends that a person working in an assembly line should have a standardized, stable work environment that is always equipped with the right tools in spaces that can be reached without having to look up, eliminating a waste of motion. By designing workstations that are ergonomically correct, the person does not have to waste time by “setting up” the workstation; everything is ready for the task to be completed immediately.

More information is available from Fleming in Rexroth’s lean manufacturing podcast episode 16, “Lean in Assembly Operations” discusses how to apply lean concepts to automation. The episode is the latest in a series of Rexroth podcasts dedicated to lean manufacturing education. The podcast series is also available from the iTunes podcast library and other podcast directories on the web. Related and supporting information is available.

For more information on lean manufacturing visit www.boschrexroth-us.com/lean

http://www.boschrexroth-us.com/leanwww.boschrexroth-us.com

Bosch Rexroth

- Edited by Gust Gianos, Control Engineering, www.controleng.com



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. The 2012 Top Plant winners have been named.
In 2012, Plant Engineering's Product of the Year program will celebrated its 25th anniversary. Read about the 2012 winners and nominate for 2013.
The Leaders Under 40 program features outstanding young people who are making a difference in manufacturing. View the 2012 Leaders here.
Find the fake! Counterfeit electrical equipment a clear and present danger
Investment in excellence: One plant's improved productivity and quality was repaid when their company expanded the facility
Strategic uptime, Increased capacity goes right to the bottom line
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Alarm management tips, Power management, Building automation
Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Attacking Energy Costs: Strategies for showing financial return on energy management investments

2012 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.