200 Eye Street SE Renovation. Washington, D.C. Courtesy: GHT LimitedEngineering firm: GHT Limited
2013 MEP Giants rank:
57
Project:
200 Eye Street SE Renovation
Address:
Washington, D.C., United States
Building type:
Office
Project type:
Adaptive Reuse
Engineering services:
Electrical/Power, HVAC
Project timeline:
10/26/2009 to 11/30/2012
Engineering services budget:
N/A
MEP budget: $824,000

Challenges

200 Eye Street SE is the largest project in the District of Columbia (DC) to receive double LEED Platinum certification, earning the highest level of certification under the Core and Shell and Commercial Interiors rating systems. The evolution of the building from a long-vacant printing facility to sustainably designed office space for DC government agencies was the result of a very successful public-private partnership between developer StonebridgeCarras and the DC government. GHT Limited provided mechanical, electrical, and plumbing (MEP) engineering design in partnership with the architect, Hickok Cole. The adaptive reuse of the existing base building and the tenant fit-out for the DC government agencies that occupy the facility included a complete replacement of its mechanical system. All documentation for the project was produced using Revit building information modeling (BIM) software.

Solutions

The project was open plan and open ceiling with 13-ft slab-to-slab heights over much of the project. To fulfill the client’s functional and aesthetic goals, there were many intensive working sessions to coordinate various design elements—most notably architectural and structural with mechanical. Because of the technical and design challenges involved, clear and consistent communication was required to educate the client on the design intent and confirm that it would meet the client’s needs.

The project includes a high-performance central HVAC plant; bathroom fixtures and toilets that help reduce potable water consumption by 75% per year; and a Dolphin WaterCare system, a chemical-free treatment solution that reuses discharge water and will save approximately 320,000 gal of water annually. In addition, the storm water collected through the drains is piped underground to a storage facility used by the owners of an adjacent park to supply landscape irrigation and a skating rink.



No comments
The Top Plant program honors outstanding manufacturing facilities in North America. View the 2013 Top Plant.
The Product of the Year program recognizes products newly released in the manufacturing industries.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
The true cost of lubrication: Three keys to consider when evaluating oils; Plant Engineering Lubrication Guide; 11 ways to protect bearing assets; Is lubrication part of your KPIs?
Contract maintenance: 5 ways to keep things humming while keeping an eye on costs; Pneumatic systems; Energy monitoring; The sixth 'S' is safety
Transport your data: Supply chain information critical to operational excellence; High-voltage faults; Portable cooling; Safety automation isn't automatic
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Plant Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Synchronizing industrial Ethernet networks; Selecting protocol conversion gateways; Integrating HMIs with PLCs and PACs
Why manufacturers need to see energy in a different light: Current approaches to energy management yield quick savings, but leave plant managers searching for ways of improving on those early gains.

Annual Salary Survey

Participate in the 2013 Salary Survey

In a year when manufacturing continued to lead the economic rebound, it makes sense that plant manager bonuses rebounded. Plant Engineering’s annual Salary Survey shows both wages and bonuses rose in 2012 after a retreat the year before.

Average salary across all job titles for plant floor management rose 3.5% to $95,446, and bonus compensation jumped to $15,162, a 4.2% increase from the 2010 level and double the 2011 total, which showed a sharp drop in bonus.

2012 Salary Survey Analysis

2012 Salary Survey Results

Maintenance and reliability tips and best practices from the maintenance and reliability coaches at Allied Reliability Group.
The One Voice for Manufacturing blog reports on federal public policy issues impacting the manufacturing sector. One Voice is a joint effort by the National Tooling and Machining...
The Society for Maintenance and Reliability Professionals an organization devoted...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
Maintenance is not optional in manufacturing. It’s a profit center, driving productivity and uptime while reducing overall repair costs.
The Lachance on CMMS blog is about current maintenance topics. Blogger Paul Lachance is president and chief technology officer for Smartware Group.