Login  |  Register          Free Newsletter Subscription
FirstLight
Subscribe
Email
Print
Reprint
Learn RSS

Field test instruments

-- Plant Engineering, 9/15/2008

The CalMaster 2 suite of electromagnetic flowmeter test instruments comprises two stand-alone electronic test instruments. The tool verifies calibration to within ±1% while the magmeter remains in operation. A 15-minute test covers the primary sensor, transmitter and connected shielded cable, offering traceability to NIST calibration with a printed certificate. It stores up to 100 tests; does not require a connected PC for checking calibrations in the field; and offers an instant “pass/fail” indication via a programmable display. The tool is designed primarily for new installations, and allows users to provide printed proof that tested flowmeter components have been installed and connected properly.

ABB Instrumentation

www.abb.com

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

There are no other articles written by this author.

Sponsored Links


Plant Engineering Resource Center

Browse Resources by Type:


 
Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Podcasts
  • Photos

Blogs

  • January 22, 2008
    Windows Vista – Another Mandate from Microsoft – You got the patch yet?
    I have been using Windows Vista for some time now with much angst. It doesn’t matter if I...
    More
  • » VIEW ALL BLOGS RSS

Photos

Advertisements





NEWSLETTERS
Click on a title below to learn more.

Plant Engineering PlantMail!
Plant Engineering Hotwire
Plant Engineering Hotwire Automation
Plant Engineering Maintenance Connection
Plant Engineering Sustainable Manufacturing
©2009 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites