Login  |  Register          Free Newsletter Subscription
FirstLight
Subscribe
Email
Print
Reprint
Learn RSS

Tie Lean, Six Sigma strategies to plant worker's knowledge

Bob Vavra -- Plant Engineering, 3/1/2007

While manufacturing improvement strategists have their supporters, researchers who look at the implementation of such programs understand that engaging workers at the plant floor level is crucial to success.

“Most people on the plant floor are not used to being asked questions, but it is a key leap of the continuous improvement program,” said Ralph Rio, research director for ARC Advisory Group at their Collaborative Manufacturing Strategies Forum in Orlando Feb. 14. “It takes two years to get through the cultural change, but if you have the first mover advantage, you can exert pressure on your competitors.”

In those two years, Rio noted, starting with a Lean strategy and augmenting it with Six Sigma allows for the plant to measure the process and people involved in manufacturing. “Six Sigma aligns the organization vertically, while Lean is horizontal,” Rio said. “In some organizations, there's some conflict, but that's usually empire building.”

“The success of the strategy is driven by both a top-down management initiative and the full engagement of the plant manager,” said Paul Husby, vice-president of supply-chain services and operations for 3M.

“The value of a top-down program is essential,” Husby said. “The first two hours of a plant manager's day is spent on the shop floor. This is a huge cultural change. The plant manager either leads this effort or it won't work.”

Husby related that one plant production manager at a 3M facility said, “Since this started, I know so much more about the day-to-day details of what's going on in my area.”

Husby said the integration of the Lean system and the data available from MES systems is another important factor in driving change through Lean and Six Sigma. “Stability controls the speed of improvement. MES is a vital part of this stability,” Husby said. “Your MES provides a lot of data and monitors defect detection. That's a key part of how you improve stability.”

A continuous improvement program is a major part of what successful manufacturers need to remain competitive. Rio noted that the attention to continuous improvement also can keep other plant floor pressures at bay. “Cost is a variable,” Rio said. “Continuous improvement is about the only thing you can control.”

Plant Engineering magazine was a media sponsor of the ARC Advisory Group forum. Details on the event can be found at www.arcweb.com.

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

Sponsored Links



 
Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Podcasts
  • Photos

Blogs


Sorry, no blogs are active for this topic.

» VIEW ALL BLOGS RSS

Photos

  • 2007 Product of the Year Winners
    This year's Plant Engineering Product of the Year winners were honored at the Manufacturing Summit in Chicago.
  • Top Plant: GEMA
    The game plan for GEMA (Global Engine Manufacturing Alliance) focuses on best-in-class execution
  • Top Plant: SEW Eurodrive
    SEW Eurodrive builds a culture based on employee empowerment and continuous improvement.
Advertisements





NEWSLETTERS
Click on a title below to learn more.

Plant Engineering PlantMail!
Plant Engineering Hotwire
Plant Engineering Hotwire Automation
Plant Engineering Maintenance Connection
Plant Engineering Sustainable Manufacturing
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites