Login  |  Register          Free Newsletter Subscription
FirstLight
Subscribe
Email
Print
Reprint
Learn RSS

Sweat the small stuff

By Richard L. Dunn, Chief Editor -- Plant Engineering, 9/1/2004

Back in 1997 an inspirational book by Richard Carlson titled, Don't Sweat the Small Stuff: And It's All Small Stuff, became a bestseller. It's still very popular. Based on the idea that we can reduce stress and anxiety in our lives "if we learn not to worry about little things," Carlson provided a plethora of tips on how we can learn to deal with life's annoyances and enjoy "the magic and beauty" of life.

Unfortunately, the title almost became a mantra for anybody who wanted to duck responsibility or ignore details. That isn't the point of the book, of course, but for many the title said it all.

One place the concept most emphatically does not apply is in today's industry, where sweating the small stuff is the heart of quality and productivity. By sweating the small stuff, for example, the Japanese provided a model that turned U.S. industry on its ear.

I'm reminded of this notion periodically when I contemplate what defines excellence in plant engineering and maintenance. As I have the opportunity to study what makes various plants outstanding performers, I'm invariably struck with their attention to the details of the basics.

Successful preventive maintenance, for example, is dependent on attention to the small stuff that prevents the "big stuff" from happening. And it requires relentless attention to the details of scheduling and record keeping. Preventive maintenance demands sweating the small stuff.

The same holds true for predictive maintenance. PdM is, after all, an analysis of the small, telltale details that signal something bigger will happen if action is not taken. It is meaningless without attention to the small stuff.

And what about the bigger activities like shutdowns/turnarounds, rebuilds, or expansions? Here again, the more detailed and thorough the planning, the greater the likelihood of completion on time and on budget. We all know the agony of watching a project come to a halt because a single, "insignificant" part wasn't in stock or some other detail was overlooked.

The list could go on and on. And while every enterprise likes to point to its major accomplishments, the most successful ones recognize that continuous improvement is the result of innumerable small accomplishments. It isn't enough to reduce energy consumption just by installing the latest technology. You still have to turn off the lights when they aren't needed.

It may be all well and good to keep our perspective by asking, as Carlson suggests, "Will this really matter a year from now?" After all, so much of what we fret about is unimportant in the total scheme of our lives.

Yet, I've never run across a plant that was able to achieve excellence with the slogan, "Don't sweat the small stuff."

It's vital to develop big ideas, set big goals, and keep a focus on the most important things in our lives — professional and otherwise. But it's sweating the small stuff day by day that eventually makes those ideas reality and provides the foundation for continuous improvement and consistent excellence.

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

Sponsored Links


Plant Engineering Resource Center


 
Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Podcasts
  • Photos

Blogs

  • January 22, 2008
    Windows Vista – Another Mandate from Microsoft – You got the patch yet?
    I have been using Windows Vista for some time now with much angst. It doesn’t matter if I...
    More
  • Bob Vavra
    Five Fast Things

    August 8, 2007
    Finding the real competitive advantage...
    1. Getting the right message to Washington: The issue of a level competitive playing field for U.S. ...
    More
  • » VIEW ALL BLOGS RSS

Photos

  • 2007 Product of the Year Winners
    This year's Plant Engineering Product of the Year winners were honored at the Manufacturing Summit in Chicago.
  • Top Plant: GEMA
    The game plan for GEMA (Global Engine Manufacturing Alliance) focuses on best-in-class execution
  • Top Plant: SEW Eurodrive
    SEW Eurodrive builds a culture based on employee empowerment and continuous improvement.
Advertisements





NEWSLETTERS
Click on a title below to learn more.

Plant Engineering PlantMail!
Plant Engineering Hotwire
Plant Engineering Hotwire Automation
Plant Engineering Maintenance Connection
Plant Engineering Sustainable Manufacturing
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites