Login  |  Register          Free Newsletter Subscription
Subscribe
Email
Print
Reprint
Learn RSS

Solutions

Staff -- Plant Engineering, 4/1/2003

Pulling wire over ceiling tile

Problem: When installing a sound system in an existing room with a dropped ceiling, wires must be pulled from one side of the room to the other. Is there an easy way to do this without disturbing the tiles?

Solution: Most rooms don't have a diagonal measurement greater than 30 ft. Remove the ceiling tiles from both ends of the wire path. Use a 50-ft tape measure with a wide blade. Extend the tape, attach the wires to it, and retract the blade.

Contributor: Ralph Bauer, Sewing Technician, JM Originals, Ellenville, NY.

Divide equally

Problem: Sometimes there is a need to divide a sheet of material into equal strips where size is not important. How can the material be easily marked without using a measurement?

Solution: Take a straightedge that is longer than the sheet is wide and mark it off with equal segments for the number of strips required. Lay it on the material at a diagonal with the first mark at one edge and the last mark at the other. Make a set of marks on the sheet. Repeat the process at another location. Draw lines through the marks. Now the material is equally divided no matter what the width is.

Contributor: Steve Deren, Engineering Associate, KSM Shelburne Mfg., Shelburne, Ontario.

Clean solution

Problem: Foot-operated hand washbasins have valves that frequently wear out and have to be replaced. Is there an easy way to replace them and eliminate the problem?

Solution: Eliminate the foot-operated mechanism by mounting a motion sensor about five feet above the basin in an enclosure with a hole in the bottom. Wire the motion sensor contacts to a water solenoid valve. Now repairs should be easy.

Contributor: Jose Govinden, Maintenance Mechanic, Sandmeyer Steel Co., Philadelphia, PA.

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

Sponsored Links



 
Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Podcasts
  • Photos

Blogs


Sorry, no blogs are active for this topic.

» VIEW ALL BLOGS RSS

Podcasts

Photos

  • 2007 Product of the Year Winners
    This year's Plant Engineering Product of the Year winners were honored at the Manufacturing Summit in Chicago.
  • Top Plant: GEMA
    The game plan for GEMA (Global Engine Manufacturing Alliance) focuses on best-in-class execution
  • Top Plant: SEW Eurodrive
    SEW Eurodrive builds a culture based on employee empowerment and continuous improvement.
Advertisements





NEWSLETTERS
Click on a title below to learn more.

Plant Engineering PlantMail!
Plant Engineering Hotwire
Plant Engineering Hotwire Automation
Plant Engineering Maintenance Connection
Plant Engineering Sustainable Manufacturing
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites