Login  |  Register          Free Newsletter Subscription
Subscribe
Email
Print
Reprint
Learn RSS

A fork in the road

By Richard L. Dunn -- Plant Engineering, 10/1/1999

DATELINE: Chicago, August 1999 -- Heat wave. The lights have gone off. Electric power is out. Some areas will be without power for days. Others will have it returned only to have it go out again. Throughout the city, power failures have become so common and so serious that the mayor is steaming. The CEO of the power company is making public apologies. Within the company, heads are rolling. The vice president of engineering, construction, and maintenance, a 23-yr employee, has "resigned." The problems, a company official explains, are "inevitably attributable to lack of rigorous maintenance and attention."

The experiences of ComEd, the power company serving Chicago should be a lesson to all industry. Cutting back on engineering, maintenance, personnel, and equipment is not good business in the long run.

For many companies, the Chicago Tribune hit the nail on the head when it ran a commentary that said, "Today's industrial leadership is more interested in immediate results, head counts, cost per square foot, perks, bonuses, parachute packages, and Wall Street recognition."

Of course, the downsizings, cutbacks, and reorganizations are always couched in the business-speak of return on investment, strategic repositioning, stockholder equity, competitive threat, and all manner of other obfuscation.

All of this translates into a frustrating dilemma for the conscientious plant engineer who is expected to prevent breakdowns and protect the corporate assets while supporting management's business goals of maximizing short-term profits and returns.

Under such conditions, the best course of action, it seems, would be to follow the advice attributed to Yogi Berra: "When you come to the fork in the road, take it." If only you could.

It's easy to see which road should have been taken long after you've gone through the intersection. Hindsight is always 20:20 and all that. But at each decision point along the way, it's not so clear.

I'd like to give management the benefit of the doubt by saying that they make the best decisions they can at the time, given the information available at the time. But it is becoming increasingly difficult to be so charitable. When an industrial infrastructure deteriorates, the condition of equipment and components is nearly always well known. And the decisions not to correct the conditions are nearly always based on short-term profit considerations.

With responsibilities both for preventing equipment failures and for supporting financial objectives, which route do you tend to take at the fork in the road?

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

Sponsored Links



 
Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Podcasts
  • Photos

Blogs


Sorry, no blogs are active for this topic.

» VIEW ALL BLOGS RSS

Podcasts

Photos

  • 2007 Product of the Year Winners
    This year's Plant Engineering Product of the Year winners were honored at the Manufacturing Summit in Chicago.
  • Top Plant: GEMA
    The game plan for GEMA (Global Engine Manufacturing Alliance) focuses on best-in-class execution
  • Top Plant: SEW Eurodrive
    SEW Eurodrive builds a culture based on employee empowerment and continuous improvement.
Advertisements





NEWSLETTERS
Click on a title below to learn more.

Plant Engineering PlantMail!
Plant Engineering Hotwire
Plant Engineering Hotwire Automation
Plant Engineering Maintenance Connection
Plant Engineering Sustainable Manufacturing
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites