Contact repair
By Staff -- Plant Engineering, 7/1/1999
Electrical contact repair and fabrication capabilities are explained in a 4-p brochure. The literature details how a new state-of-the-art facility can produce or repair any electrical contact with quality that meets or exceeds original equipment specifications. Average turnaround time is 1-2 wk, with emergency service in 1-4 days.Helwig Carbon Products, Inc.
www.helwigcarbon.com
Talkback
Related Content
Related Content
Sponsored Links




















