Login  |  Register          Free Newsletter Subscription
FirstLight
Subscribe
Email
Print
Reprint
Learn RSS

Physically ineligible: Is he entitled to recall?

By Raymond Dreyfack -- Plant Engineering, 3/1/1999

When six recalled employees showed up for work Monday morning, Maintenance Foreman Joe Mullen was shocked to see that one, Carpenter Grade I Harry Berne, had lost his left hand in an automobile accident sometime during the layoff.

Mullen handed the other five workers their time cards but held back Berne's. No way would he have been hired if he was a new applicant.

"That accident was a rough break," Mullen said sympathetically, "and I'll put you in for a transfer for clerical work if you want. But I don't see how you can continue in your former classification now that you're handicapped."

"I checked that out with the doctor," Berne replied. "He says there's no reason I can't pick up right where I was before the accident with a little adjustment. I'm being fitted for a prosthetic device. I'll even be able to lift heavy stuff. Before long I'll be good as new."

Mullen frowned. "I don't know, Harry..."

"There's nothing to know. A guy doesn't lose his skills and experience because he loses a hand."

"You may have a point. I'll check it out with the boss and get back to you."

Question: Is Berne's contention that he'll be "good as new" wishful thinking? Would you reinstate him in his old job?

Pollock's verdict: "Put him back as Grade I," Plant Engineer Fred Pollock instructed Mullen. "His doctor's prognosis should be all we need to give him a crack at his former job. It's both the humane and pragmatic course of action to take. If, after giving him a fair chance to make good, his performance suffers because of his handicap, or if we see there's a safety problem involved, we can deal with it then."

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

Sponsored Links



 
Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Podcasts
  • Photos

Blogs

  • Bob Vavra
    Five Fast Things

    September 16, 2008
    What do the Chinese know, and what can we learn?
    1. Reaching across a great wall: Members of the Chinese Machine Tool and Tool Builders’ Associ...
    More
  • Bob Vavra
    Five Fast Things

    September 2, 2008
    Getting competitive on energy, getting tough on immigration
    1. One way to get competitive: We’ve highlighted the growing solar panel business around the U...
    More
  • » VIEW ALL BLOGS RSS

Photos

  • 2007 Product of the Year Winners
    This year's Plant Engineering Product of the Year winners were honored at the Manufacturing Summit in Chicago.
  • Top Plant: GEMA
    The game plan for GEMA (Global Engine Manufacturing Alliance) focuses on best-in-class execution
  • Top Plant: SEW Eurodrive
    SEW Eurodrive builds a culture based on employee empowerment and continuous improvement.
Advertisements





NEWSLETTERS
Click on a title below to learn more.

Plant Engineering PlantMail!
Plant Engineering Hotwire
Plant Engineering Hotwire Automation
Plant Engineering Maintenance Connection
Plant Engineering Sustainable Manufacturing
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites