Login  |  Register          Free Newsletter Subscription
Subscribe
Email
Print
Reprint
Learn RSS

Effectiveness impaired by health: What to do?

By Raymond Dreyfack -- Plant Engineering, 7/1/1998

When Instrument Repairman Frank Nelson lost an eye in a car accident, it created work problems in addition to the physical and psychological trauma. A competent employee before the accident, Nelson's performance was adversely affected. His productivity faltered. He made excessive errors reading and adjusting gauges.

This saddled Maintenance Foreman Chuck Raven with a problem. On the one hand, Frank was a longtime and valued employee who had been hit with a health catastrophe. It was against Raven's nature to strike a man when he was down. On the other hand, Frank's poor productivity was playing havoc with the schedule, and his errors were producing problems.

Raven discussed the situation with Frank, who promised to be more careful and try to work faster. But Frank's problem wasn't motivation, attitude, or experience. He was less productive because of his impaired eyesight.

"Frank, does the doctor expect your sight to improve?"

"He's not optimistic, but you never know."

Two weeks passed with no change. If anything, the errors grew more numerous. Raven was torn between his compassion for Frank and his supervisory responsibility. He decided to consult his boss.

Pulaski's advice: Plant Engineer Jeff Pulaski frowned as he heard Raven out. "This is a tough one. Frank's a 10-yr veteran with a fine work record. But we can't ignore the reality. He works on close adjustments and sets gauges not always easily accessible. The job call for above-average vision. A person with impaired sight couldn't perform the work efficiently."

Pulaski shook his head. "I know of no openings for a man with Frank's talent and experience. Still, you can't fire a man with his fine record and length of service. I can think of no way to use him productively, unless -- "

Pulaski looked thoughtful. " -- unless we created a job for him. How would you feel if we made Frank a troubleshooter? He would be used to identify problems and work out solutions, then turn over the detail work to someone else."

Raven's face brightened. "That's perfect!"

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

Sponsored Links



 
Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Podcasts
  • Photos

Blogs

  • David Sanders
    The General List

    August 21, 2008
    Environmental Management Systems Part 2
    The EMS road has been enlightening to say the least. What began as a daunting task has become a grea...
    More
  • David Sanders
    The General List

    July 30, 2008
    In The Trenches with Joey
    There is something to be said for natural talent. Take Joey Howard for instance. Joey manages our pu...
    More
  • » VIEW ALL BLOGS RSS

Podcasts

Photos

  • 2007 Product of the Year Winners
    This year's Plant Engineering Product of the Year winners were honored at the Manufacturing Summit in Chicago.
  • Top Plant: GEMA
    The game plan for GEMA (Global Engine Manufacturing Alliance) focuses on best-in-class execution
  • Top Plant: SEW Eurodrive
    SEW Eurodrive builds a culture based on employee empowerment and continuous improvement.
Advertisements





NEWSLETTERS
Click on a title below to learn more.

Plant Engineering PlantMail!
Plant Engineering Hotwire
Plant Engineering Hotwire Automation
Plant Engineering Maintenance Connection
Plant Engineering Sustainable Manufacturing
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites