Login  |  Register          Free Newsletter Subscription
Subscribe
Email
Print
Reprint
Learn RSS

Absence: When is a "reasonable" excuse unacceptable?

By Raymond Dreyfack -- Plant Engineering, 7/1/1998

Mechanic Grade II George Melrose was a chronic absentee. He often failed to call in when he was out. Or he offered "personal business" as an excuse.

Maintenance Foreman Steve Conn called him to account repeatedly, and had posted several warning slips to his file.

"I already gave you one last chance too many," Conn finally said. "One more time and you're gone."

And no great loss, he thought. As a performer Melrose was a shade short of mediocre. When Melrose promised to reform, Conn said, "We'll see."

That didn't take long. A month later Melrose was out three days without calling in. When he clocked in the fourth day his time card was missing from the rack.

"Someone screwed up," he told Conn, "my card's not in the rack."

"That's right, George. Someone did screw up. The someone is you. Out three days, without a call-in. This is it. Personnel has your final pay."

Melrose hesitated, then said, "I didn't call in because I was embarrassed. It was a very personal situation. Marge and I are splitting up."

"I'm sorry to hear that, George. But this has been going on for months. The termination stands."

"Hey, give me a break. You can't hit a man when he's down."

Question: Should Melrose be given yet another final chance?

Berner's verdict: "I feel for the guy as you do," Plant Engineer Frank Berner told Conn. "But we have to consider all aspects of this case. Melrose is a chronic absentee who failed to shape up despite your having bent over backwards to allow him to do so. On top of that, he has an attitude problem and his work record is poor. Even if his marital problem necessitated his absence, the least he could have done was call in. The man's an obvious loser, and I don't think his loss should be at the company's expense. The dismissal stands."

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

Sponsored Links



 
Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Podcasts
  • Photos

Blogs

  • Bob Vavra
    Five Fast Things

    September 16, 2008
    What do the Chinese know, and what can we learn?
    1. Reaching across a great wall: Members of the Chinese Machine Tool and Tool Builders’ Associ...
    More
  • Bob Vavra
    Five Fast Things

    September 2, 2008
    Getting competitive on energy, getting tough on immigration
    1. One way to get competitive: We’ve highlighted the growing solar panel business around the U...
    More
  • » VIEW ALL BLOGS RSS

Podcasts

Photos

  • 2007 Product of the Year Winners
    This year's Plant Engineering Product of the Year winners were honored at the Manufacturing Summit in Chicago.
  • Top Plant: GEMA
    The game plan for GEMA (Global Engine Manufacturing Alliance) focuses on best-in-class execution
  • Top Plant: SEW Eurodrive
    SEW Eurodrive builds a culture based on employee empowerment and continuous improvement.
Advertisements





NEWSLETTERS
Click on a title below to learn more.

Plant Engineering PlantMail!
Plant Engineering Hotwire
Plant Engineering Hotwire Automation
Plant Engineering Maintenance Connection
Plant Engineering Sustainable Manufacturing
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites