Login  |  Register          Free Newsletter Subscription
Subscribe
Email
Print
Reprint
Learn RSS

Is a procedural short cut punishable?

By Raymond Dreyfack -- Plant Engineering, 4/1/1998

On the one hand, procedures are set up to be followed. On the other, employees should be encouraged to use their imagination and initiative. Where does one draw the line?

Maintenance department Fork lift Operator Bill Falk figured he could save an extra trip by stacking his vehicle with more cases of heavy components than the procedure manual called for. When the load toppled, damaging four cartons of merchandise, Foreman Frank Sutter felt Falk should be penalized for failing to follow instructions. He handed the employee a disciplinary layoff.

Falk protested the suspension on the grounds that he was trying to save time on the job, and also that he had misjudged the load's weight, a human error anyone could have made. Sutter contended that an experienced operator like Falk should have calculated the weight beforehand, and should have understood the dangers of overload.

When Falk threatened a grievance unless the suspension was lifted, Sutter made a beeline for his boss' office.

Question: Do you think the suspension was justified?

Benson's verdict: Plant Engineer Ralph Benson agreed with Sutter that an experienced operator like Falk should have had the good sense to check the load's weight before transporting it. Nonetheless he instructed the foreman to reduce the penalty to an official warning notice.

"For one thing," he said, "Falk is a well-rated worker. Although his judgment was faulted, his intentions were good. In addition, similar accidents have occurred in the past, admittedly with less or no damage involved, in which no discipline was imposed. When a discipline is imposed, consistency is usually a major consideration in rulings by arbitrators."

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

Sponsored Links



 
Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Podcasts
  • Photos

Blogs

  • Bob Vavra
    Five Fast Things

    September 16, 2008
    What do the Chinese know, and what can we learn?
    1. Reaching across a great wall: Members of the Chinese Machine Tool and Tool Builders’ Associ...
    More
  • Bob Vavra
    Five Fast Things

    September 2, 2008
    Getting competitive on energy, getting tough on immigration
    1. One way to get competitive: We’ve highlighted the growing solar panel business around the U...
    More
  • » VIEW ALL BLOGS RSS

Podcasts

Photos

  • 2007 Product of the Year Winners
    This year's Plant Engineering Product of the Year winners were honored at the Manufacturing Summit in Chicago.
  • Top Plant: GEMA
    The game plan for GEMA (Global Engine Manufacturing Alliance) focuses on best-in-class execution
  • Top Plant: SEW Eurodrive
    SEW Eurodrive builds a culture based on employee empowerment and continuous improvement.
Advertisements





NEWSLETTERS
Click on a title below to learn more.

Plant Engineering PlantMail!
Plant Engineering Hotwire
Plant Engineering Hotwire Automation
Plant Engineering Maintenance Connection
Plant Engineering Sustainable Manufacturing
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites