Log In   |  Register Free Newsletter Subscription
Skip navigation
Zibb
Subscribe to Plant Engineering
FirstLight
RSS
Reprints/License
Print
Email

Updated kaizen manual now available

By Plant Engineering Staff -- Plant Engineering, 10/13/2006 10:00:00 AM

The Society of Manufacturing Engineers recently published the fifth edition of the KaizenEvent Implementation Manual by Geoffrey L. Mika.

Revised and expanded in its fifth edition, the Kaizen Event Implementation Manual has seen use in many industries, for a range of applications. It provides workers at many levels of an organization with a how-to guide for planning, organizing and implementing kaizen events. Its hands-on presentation, including reusable charts and forms, brings a level of competence and understanding to event teams and participants as they become self-sufficient in the application and use of kaizen.

A "lean" advocate and implementer for more than 20 years, Mika received his formal training on the Toyota Production System at Toyota Motor Co. and Shingijutsu in Japan. A Black-belt and Master Kaizen Sensei, he began his own consultancy in 1987. Now known as Kaizen Sensei (formerly World Class Management Consultants), his consultancy has facilitated more than 360 kaizen implementations in 27 countries. He is a graduate of Wayne State University, certified by the American Production and Inventory Control Society and a member of SME and the American Society for Quality.

Originally used by Toyota, kaizen is a results-oriented tool that fosters continuous improvement. In the United States, kaizen is usually an event that runs three to five days and is comprised of intensive improvement activities directed at specific areas of a business. The main goal of kaizen is the elimination of non-value-added activities, or waste, through the implementation of one-piece flow, working to takt time and instituting a pull system. The mantra is to manufacture only what is needed by the customer, when it is needed in the quantities ordered. Kaizen has been shown to collapse lead times, dramatically reduce work-in-process and reduce scrap and defects while minimizing the need for capital expenditures.

RSS
Reprints/License
Print
Email
Talkback
Related Content
Also by PLE Staff

Reed Business Information Resource Center

Featured Company


Most Recent Resources

Advertisement

Related Microsite Content

Related Links

More Content
  • Blogs
  • Photos
  • Podcasts

Sorry, no blogs are active for this topic.

VIEW ALL BLOGS RSS
25906

2008 Salary Survey

The 2008 Plant Engineering Salary Survey: More income, more worries for plant managers

11797

2007 Product of the Year Winners

This year's Plant Engineering Product of the Year winners were honored at the Manufacturing Summit in Chicago.

6882

Top Plant: GEMA

The game plan for GEMA (Global Engine Manufacturing Alliance) focuses on best-in-class execution

  • Making the Most of Your Energy in the Packaging Industry Podcast


    There are many drivers regarding the concept of sustainability for both packaging facility owners and managers and packaging OEMs, but a shift toward a lower carbon footprint for the packaging machine itself is coming to the fore, which suggests more astute energy management. Hear It Now

Advertisement
2010Sensors125x125
NEWSLETTERS
PlantMail
Plant Engineering Hotwire
Hotwire on Automation
Maintenance Connection
Sustainable Manufacturing



Please read our Privacy Policy

About Us   |   Advertising Info   |   Site Map   |   Contact Us   |   FREE Subscription   |   Affiliate Links   |   RSS
© 2010 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites